ECO-1608 · REV U · effective October 3, 2026

Production TechnologyAPPROVEDEngineering notice

Daimler Truck Plans New US Assembly Plant, Targets 2029 Start

DTNA will start construction in late 2026 on a new US assembly plant, targeting 2029 operations and thousands of jobs. Site selection is still underway.

Scope of change

  1. Construction targeted to begin in late 2026; operations to start in 2029 at a still-unnamed US site.
  2. DTNA expects the plant to create thousands of manufacturing jobs; no capacity figure disclosed.
  3. Announcement follows July 2025 layoffs of 2,000 workers; 400 recalled in September, up to 200 more possible by year-end.
  4. DTNA currently runs assembly plants in Cleveland, Gastonia, Mount Holly, and High Point, NC, plus Gaffney, SC.
Daimler Truck to Build New US Assembly Plant
Fig. 01Daimler Truck to Build New US Assembly Plant — AI-generated

Daimler Truck North America plans to build a new greenfield assembly plant in the United States, with construction targeted to begin in late 2026 and operations to start in 2029. The company projects the facility will create thousands of manufacturing jobs, though it has not yet named a capacity figure, a product assignment, or a location.

The announcement, made from DTNA's Portland, Oregon headquarters, is an intention rather than a confirmed capacity plan. DTNA is still evaluating multiple potential sites. Its site-selection criteria include supply chain access, skilled workforce availability, transportation and logistics infrastructure, a favorable business environment, and alignment with the company's long-term manufacturing strategy.

"This new manufacturing facility supports our long-term growth plans for North America," Karin Rådström, president and CEO of Daimler Truck, said in a statement. "It strengthens our ability to serve customers by responding faster and more flexibly to their evolving needs while unlocking our full potential through growth, scale and efficiency."

The company says the purpose-built plant will expand manufacturing capacity across both vocational and on-highway truck production, and will feature advanced production technologies and flexible manufacturing systems. DTNA has not specified which truck lines would run in the new facility, nor whether it would take volume from existing plants or add net capacity.

The move comes against a backdrop of recent contraction in DTNA's North American manufacturing network, not expansion. In July 2025 the truck maker laid off 2,000 workers across that network. In September it announced it would bring back 400 of those assembly line workers, and said it could recall an additional 200 by the end of the year. A new plant announced while recall headcount is still trickling back raises the question of how DTNA will balance greenfield capacity against underutilized lines elsewhere — a question the company has not yet addressed publicly.

DTNA's existing assembly footprint is concentrated in the Carolinas: Cleveland, North Carolina; Gastonia, North Carolina; Mount Holly, North Carolina; High Point, North Carolina; and Gaffney, South Carolina. Portland remains the company's headquarters and engineering hub.

For suppliers, the announcement is a signal to watch rather than act on immediately. Greenfield truck assembly plants typically pull in tier-one sequencing, chassis, cab component, and axle suppliers within logistics range of the site, and the site-selection criteria DTNA listed — supply chain access and transportation infrastructure foremost among them — indicate supplier proximity will factor into the final decision. No supplier commitments have been announced.

The timing matters for the market cycle. A 2029 production start places the plant's ramp-up several years out, giving DTNA flexibility to time volume against the freight cycle rather than responding to current demand. The company framed the investment as supporting long-term customer demand and operational flexibility across North America.

What to watch next: the final site selection, which will trigger construction timing and state incentive packages; the assignment of truck platforms to the new plant and whether volume shifts from the Carolinas facilities; and concrete capacity and headcount numbers, which DTNA has so far described only in general terms as "thousands" of jobs. The pace of the worker recalls through year-end will also indicate how tight DTNA's existing capacity actually is before the new plant comes online.

via bnpmedia.com (Original)

Filed under

  • daimler-truck
  • dtna
  • assembly-plant
  • greenfield
  • north-america
Share this article:

More from Grace Kim

Grace Kim

Show full bio

Staff writer covering industry trends and analytics at Autoplant Brief.

82 articles

Also circulated

« Previous article