Effective November 22, 2026

Suppliers & Tier-1sEngineering notice

Niron Magnetics to build $1.8 billion magnet plant in Dothan

Governor Kay Ivey announced a $1.8 billion Niron Magnetics plant in Dothan, Alabama — 10,000 tons of rare-earth-free iron nitride magnets, 700 jobs, construction from 2028, production in 2029.

Scope of change

  1. Niron Magnetics will invest $1.8 billion in a Dothan, Alabama plant creating 700 jobs within five years.
  2. The facility targets 10,000 tons of annual capacity, with construction in 2028 and production from 2029.
  3. Niron's first plant in Sartell, Minnesota opens in 2027 with up to 1,500 tons of annual capacity.
  4. The 1.6-million-square-foot campus will occupy the 446-acre Westgate Super Site, served by CSX rail.
  5. About 90% of global rare-earth magnet production is concentrated overseas, per the governor's office.
Gov. Kay Ivey announces $1.8 billion manufacturing plant coming to Dothan
Fig.Gov. Kay Ivey announces $1.8 billion manufacturing plant coming to Dothan — Tama66 / pixabay

Niron Magnetics will spend $1.8 billion on a 10,000-ton permanent magnet plant in Dothan, Alabama, creating 700 high-wage jobs within five years. Governor Kay Ivey announced the project, which makes the Minneapolis-based startup the latest entrant in the U.S. push to break dependence on overseas rare-earth magnet supply.

Construction is expected to begin in 2028, with production starting in 2029. Those are company timelines, not confirmed capacity plans, and the project's scale dwarfs Niron's operating record — the Dothan facility will be its second plant.

Niron, founded in 2013 and headquartered in Minneapolis, says it commercialized the world's first high-performance permanent magnets that contain no rare-earth elements. Its technology uses iron nitride (a compound of iron and nitrogen) in place of neodymium, relying on abundant domestic materials to offer a cost-competitive alternative to conventional rare-earth magnets.

What does this change for magnet buyers?

For purchasing teams in automotive, electronics and industrial sectors, the announcement adds a second committed domestic capacity pool. Niron's first high-volume plant, in Sartell, Minnesota, opens in 2027 with an annual capacity of up to 1,500 tons. Dothan's 10,000-ton design target would take the company's combined output to 11,500 tons — though that figure depends on both plants reaching rated output on schedule.

The context matters here. Roughly 90% of global rare-earth magnet production sits overseas, according to the governor's office, which framed the investment as a way to reduce supply chain vulnerability across automotive, advanced technology and defense.

Niron says its magnets already power applications in AI infrastructure, automotive, industrial equipment and consumer electronics. As it scales, the company claims its broader materials platform will open development paths for next-generation motion applications.

Why Dothan won the site race

CEO Jonathan Rowntree said the company screened locations broadly before committing to Alabama. "We considered sites in 22 states, and Alabama stood out from the very first conversation," Rowntree said. "Every step of the way, Alabama treated our success as its own."

The winning site is the 1.6-million-square-foot campus planned for the 446-acre Westgate Super Site industrial park. The city of Dothan, Houston County, the Dothan Industrial Development Board and the Dothan Area Chamber of Commerce spent years developing the site to compete for large-scale industrial projects. Infrastructure includes access to a CSX rail line, and the site earned CSX Select Site Platinum status (a rail-served site certification) in late 2025.

Governor Ivey cast the win as part of a broader state strategy. "Alabama has demonstrated time and time again that when it comes to competing for the world's most transformative industries, we are second to none," Ivey said, calling the project "tremendous news for the Wiregrass and another significant win for Alabama's growing manufacturing industry."

The verification question

Niron's output claims remain vendor announcements until Sartell demonstrates volume production in 2027. Iron nitride magnet technology is young, and no independent production data yet exists for the company's process at scale. Buyers weighing qualification timelines should treat 2029 in Dothan as a target contingent on the first plant's ramp.

What to watch next: Sartell's 2027 launch and its climb toward the 1,500-ton annual milestone, which will serve as the first real test of whether Dothan's 10,000-ton plan holds. State and local incentive terms for the Alabama project, not disclosed in the announcement, typically follow in coming weeks.

via waka.com (Source)

Filed under

  • niron-magnetics
  • permanent-magnets
  • iron-nitride-magnets
  • magnet-manufacturing
Share this article:

More from Marcus Bennett

Marcus Bennett

Show full bio

News editor covering regulation, policy and their impact on Automotive manufacturing and vehicle production at Autoplant Brief.

333 articles

Also circulated

« Previous article