Effective November 22, 2026
EV Manufacturing TransitionEngineering notice
Lagos puts 11 more electric buses into service on path to 552
Eleven electric buses enter service in Lagos, the first batch of 50 under a LAMATA–Oando agreement, on a path toward 552 buses. No timeline or vehicle specs have been disclosed.
Scope of change
- 11 electric buses delivered, first batch of a 50-bus agreement between LAMATA and Oando Clean Energy.
- Long-term plan covers 552 electric buses; no implementation timeline has been given.
- Pilot began in 2023 with two buses; MoU signed April 2022.
- A 2023 Oando–Yutong announcement targeted 12,000 buses in seven years; link to 552 figure unclear.
- Lagos State climate strategy targets net-zero emissions by 2050.

Eleven electric buses have entered service in Lagos, the first delivery batch from a 50-bus agreement between the Lagos Metropolitan Area Transport Authority (LAMATA) and Oando Clean Energy Limited (OCEL). The delivery marks the transition from a two-bus pilot launched in 2023 to a structured fleet expansion on the city's public transport corridors.
The long-term plan covers 552 electric buses. LAMATA has not yet given a concrete timeline for full implementation, and no technical specifications — battery capacity, range or charging power — have been released for the vehicles now arriving. That absence matters: without published data, the fleet's operational envelope on Lagos routes cannot be independently assessed.
How the project reached this point
The collaboration began in April 2022, when LAMATA and Oando Clean Energy signed a memorandum of understanding. In 2023, two electric buses arrived in Lagos for trial operation. During testing, the partners examined technical reliability, environmental impact and passenger acceptance, according to their own statements — a claim that, as with any supplier-side announcement, awaits verification against operational data. The findings now serve as the basis for gradual fleet expansion.
The pilot-to-fleet ratio gives a sense of scale. The city has moved from two trial vehicles to eleven in regular service, with 39 more due under the current agreement before the 552-bus programme begins in earnest.
What Oando Clean Energy plans beyond the buses
Vehicle procurement is only part of the programme. Oando Clean Energy intends to build local electromobility infrastructure, comprising:
- charging stations
- maintenance facilities
- training of technical personnel
- a supply of spare parts
In the long term, the company also aims to assemble electric vehicles in Nigeria, which would move the project from imports toward domestic value creation.
Financing and manufacturing support comes from several directions. The project is supported, among others, by Nigeria's Bank of Industry, Wema Bank and the Chinese vehicle manufacturer Yutong, according to the company. Potential financing partnerships with the Africa Finance Corporation (AFC) and the International Finance Corporation (IFC) are also being explored — a formulation that signals intent rather than committed capital.
The 12,000-bus question
One number in the project's history remains unresolved. As early as April 2023, Oando Clean Energy and Yutong announced plans to deploy 12,000 electric buses within seven years, starting in Lagos and including charging infrastructure plus a local assembly plant. The latest announcement does not clarify how that target relates to the 552 buses now planned. Whether 552 represents a first phase of the larger figure, or a recalibration of it, is an open question.
Why Lagos is pushing electrification
The Lagos State Government frames the expansion as part of its climate strategy, which targets net-zero emissions by 2050. Electrifying bus transport is intended to cut emissions and air pollution across the public transport network — a measurable benefit, provided the charging infrastructure and grid supply keep pace with fleet growth.
What to watch next: the delivery schedule for the remaining 39 buses under the current agreement, any published technical data on the vehicles, and whether the AFC or IFC financing talks convert into signed capital.
via electrive (Source)
More from Sophie Lindqvist
Show full bio
Correspondent covering money, funding and market shifts around Automotive manufacturing and vehicle production at Autoplant Brief.
326 articles
Also circulated
- Olectra hits 4,000 e-bus mark, lines up 2,500-unit truck plant
- Daimler Buses bets fully on battery-electric: new eCitaro platform lands 2028
- Switch Mobility Lands 840-Unit Electric Bus Order for Delhi
- Daimler Buses targets 2028 for first ground-up electric eCitaro
- Nigeria EV plant: partner unnamed, capacity unconfirmed