ECO-6376 · REV A · effective November 17, 2026
Vehicle Plants & ProductionAPPROVEDEngineering notice
Honda plans $3 billion Ohio plant with 240,000-vehicle capacity
Honda's $3 billion Ohio assembly plant would add 240,000 vehicles of annual capacity and more than 2,000 jobs from 2029, but still needs final government approval.
Scope of change
- Honda announced a US$3 billion central Ohio assembly plant with 240,000 vehicles of annual capacity, subject to final approvals.
- The project targets more than 2,000 jobs from 2029 and roughly 1.3 million vehicles of U.S. capacity.
- Honda expects North American capacity to reach about 1.9 million vehicles.
- Hybrid-system capacity at Honda Transmission Plant-Ohio is planned to rise 250%, with a new unit due in 2027.
- Honda's May 2026 hybrid plan calls for 15 Honda and Acura models worldwide by 2030.

US$3 billion in investment, 240,000 vehicles a year and more than 2,000 jobs from 2029 are Honda’s targets for a new central Ohio assembly plant, but the Japanese automaker still needs final government approvals.
Honda said the plant will lift U.S. vehicle capacity to roughly 1.3 million units annually. Across North America, the company expects capacity to reach about 1.9 million vehicles. These are announced targets tied to future production, not current plant output.
The new plant will sit between Honda’s East Liberty and Marysville assembly factories. Honda said the expanded Ohio footprint can build hybrid, gasoline and battery-electric models, allowing output to shift with demand. Its main role is hybrid production, with an electric motor assisting a gasoline engine.
Within Honda, East Liberty, Marysville and the proposed line are final-assembly operations. The transmission and engine plants in the supporting network operate as in-house Tier 1 component suppliers, where Tier 1 means making parts for an automaker’s assembly lines. The Ohio project therefore links vehicle assembly, hybrid systems and engine output in one regional reconfiguration.
That assembly expansion supports Honda’s hybrid program, announced in May 2026, which will add 15 Honda and Acura models worldwide by 2030. North America will be the main market for many of those models, Honda said, giving the new Ohio plant a central role in the company’s product mix.
At Honda Transmission Plant-Ohio, Honda’s in-house Tier 1 component operation, the company plans to raise hybrid-system capacity by 250%. A new unit is due in 2027. A larger system will follow at the Ohio operation and at Honda’s Georgia transmission operation. The dates, percentage and volumes are company plans that require production data to verify.
Across Honda’s North American component network, its Alabama operation will gain a V6 (six-cylinder) hybrid engine and allow Line 1 to build the Passport. Honda’s Anna Engine Plant, an in-house engine supplier in Ohio, will retool (modify production equipment) for a four-cylinder Atkinson-cycle engine, using a combustion cycle designed for efficiency.
Engine output also will return to Honda’s Alliston, Ontario, engine operation, another in-house component site serving the OEM’s assembly network. The Ontario restart means Honda’s broader component plan is not confined to the three states named for upgrades: Ohio, Alabama and Georgia.
What does the Ohio plant change for hybrid supply?
It adds a 240,000-unit assembly source that Honda can direct toward hybrids, gasoline vehicles or battery-electric models as demand changes. The practical effect is greater mix flexibility across East Liberty, Marysville and the new site. The main change is not the end of combustion-engine production; Honda is expanding hybrid systems while retooling or restarting engine operations.
Ohio Governor Mike DeWine said:
“Honda’s leadership could have chosen to build this plant anywhere in the world, but they chose Ohio because there are so many advantages to being here.”
“For almost half a century, Honda and Ohio have grown together, and generations of families have built their careers on Honda’s manufacturing lines.”
“Today’s announcement isn’t just an investment in a new facility – it’s an investment in Ohio’s people and Ohio’s future.”
Watch for the production-launch date, final government approval and the 2027 hybrid-unit milestone. The decisive test will be production data showing Ohio moving toward 240,000 vehicles a year, alongside employment reaching more than 2,000 jobs from 2029 and the planned 250% increase in hybrid-system capacity.
via Automotive World (Source)
More from Grace Kim
Show full bio
Staff writer covering people, launches and day-to-day practice in Automotive manufacturing and vehicle production at Autoplant Brief.
293 articles
Also circulated
- Honda Commits $3 Billion to New Ohio Hybrid Plant, 240,000 Units a Year
- Honda weighs Ohio for next US auto plant, report says
- Honda's $3 Billion Ohio Hybrid Plant Leads the Week in Manufacturing
- Honda Nears Green Light on New Ohio Hybrid Plant, Nikkei Reports
- Honda Puts $462 Million Into Alabama Plant, Adds 200 Jobs